Canaries to the Caribbean from March 2010.

Approximately 2500 minutes (it’s almost sure) to about 6 knots (we will accept a little less) and thus for about 17 days (at least without big overtaking).

The aim is not to consume fuel and make cross in an acceptable delay, the usual weather conditions allows to do it. An optimum wind less than expected would make us wait ”some time” before we decide to use the engine temporarily.

Every day a point will be done from the boat : position, engine or not, atmosphere on board …